Client: British Gypsum (Saint-Gobain)
Location: Barrow upon Soar, Leicestershire
:: Project Overview
Following an independent ecological assessment, British Gypsum appointed us to deliver a Biodiversity Net Gain (BNG) enhancement scheme at their Barrow upon Soar site. The scheme was designed to create and enhance habitats in line with BNG principles, supporting measurable biodiversity improvements and long-term ecological value.
BNG Objectives
Enhance baseline biodiversity value through targeted habitat creation
Support priority and locally relevant species
Deliver habitats capable of achieving long-term condition targets
Ensure establishment and management in line with BNG good practice
Our Role
We worked collaboratively with British Gypsum and Saint-Gobain during the pre-delivery phase to refine the habitat creation proposals and ensure they were achievable within budget while meeting ecological and BNG requirements. Our role included full implementation of the works and ongoing management to support habitat establishment.
Delivery
The scheme was delivered over one week on site in December, ensuring timely implementation during the appropriate planting season and minimising disturbance to existing habitats.
Scope of Works
Habitat creation in accordance with ecological recommendations
Installation of woodland and scrub planting to increase habitat distinctiveness
Supply and installation of appropriate tree and shrub protection
Installation of bird nesting features for target species
Provision of post-installation management to support habitat condition
BNG Outputs
- Just under 2,000 native woodland and scrub plants installed
- Habitat creation contributing to increased area and condition of woodland and scrub habitats
- 15 bird boxes installed, suitable for:
- Barn Owl
- Robin
- Great Tit
- Blue Tit
- 12 months of post-installation management included to support establishment
Biodiversity Outcomes
Enhancement of habitat connectivity and structural diversity
Increased availability of nesting and roosting features
Improved habitat condition, supporting long-term biodiversity value
Contribution towards measurable Biodiversity Net Gain units
Management & Monitoring
Post-installation management will be undertaken for a minimum of 12 months, focusing on plant establishment, replacement of failures, and protection maintenance. These measures support progression towards target habitat condition in line with BNG principles.
Outcome
The scheme was delivered in line with ecological recommendations and BNG objectives, supporting British Gypsum’s wider environmental commitments. Ongoing management will ensure habitats mature and contribute positively to long-term biodiversity value.
Client Collaboration
Contact Us
Carrier Landscapes Ltd
Station Road
Upper Broughton
Melton Mowbray
Leicestershire
LE14 3BQ